For a wood fibre insulation board plant in the Upper Palatinate, in 2023 we installed around 2,000 tonnes of steel – as a combination of Structural Steelwork and Plant Construction. Design, fabrication in our works and erection on site were all handled from a single source. The result is a load-bearing structure in which building steelwork and plant steelwork interlock.

