References

Wood Fibre Insulation Board Plant

Location
Upper Palatinate
Division
Structural Steelwork and Plant Construction
Services
Design, fabrication, erection
Period
2023
Scope
2,000 t of steel

For a wood fibre insulation board plant in the Upper Palatinate, in 2023 we installed around 2,000 tonnes of steel – as a combination of Structural Steelwork and Plant Construction. Design, fabrication in our works and erection on site were all handled from a single source. The result is a load-bearing structure in which building steelwork and plant steelwork interlock.

More references

Your personal contact for your project

Ludwig Lachmeyer, Authorised Signatory – for questions about feasibility, schedule or a quotation, you can reach me directly.

Send an enquiry