The world’s most modern concrete sleeper plant in Schwandorf
Turnkey, with complete design of all trades and construction, as well as external works.
Everything from a single source!
Steel-frame construction with insulated panel or aerated concrete cladding
3,200 m² of hall space,
1,000 m² of office space on two levels.
Hall fully served by two overhead travelling cranes of 10 t each
Eaves height, hall: 9.20 m
Eaves height, silo: 13 m


